Jeddah · Saudi Arabia · Est. 2026

Architecture
as a binary
system

Every project begins with two questions: what should be solid, and where should light pass through. We run the regulation, the programme, and the numbers before you spend a riyal on drawings.

Public position

An AI-native architecture practice in Saudi Arabia.

Every design decision is computationally derived and regulation-verified before a line is drawn.

Operational truth

10 designs strings, not objects.

A building is a sequence of 1s and 0s at five scales: glyph, frieze, signage, facade, courtyard.

Selected
work

All projects
10.01 Residential villa — articulated limestone volumes with recessed apertures
10.01 · Villa · Jeddah Hejazi Residence 560 m² · Phase 2 BIM
Courtyard void — circular aperture carved into limestone mass
10.02 · Mixed-use · Jeddah Al-Balad Courtyard 1,200 m² · Concept
Detail — bronze screen lattice with circular apertures over coral limestone
10.06 · Multi-family · Jeddah G6 Multifamily 3,400 m² · IFC Production
Design grammar

One rule.
Two elements.
Five scales.

The practice mark is the architecture. Every solid wall in a 10 project is an instance of 1. Every opening — window, door, court, oculus — is an instance of 0.

This is not symbolism. It is a design grammar: a system that produces buildings where the form and the identity are the same thing.

1 — Solid mass
Load-bearing walls, slab edges, piers, screens.
Orthogonal. Rectilinear. Weight-bearing.
0 — Carved void
Apertures, courts, oculi, curved cantilevers.
Every project must contain at least one.
1+0 — Merge zone
Where mass transitions into void: the arch, the reveal, the battered wall, the recessed frame.
What we do

Design
informed
by data

01
Regulatory compliance, before you commit

We verify your plot against MOMAH, SBC, and DASC ADG_06 before Phase 1 begins. FAR, coverage, setbacks, parking — calculated, not guessed.

MOMAH federal authority review DASC ADG_06 character compliance (Hejazi Coast) Amanah permit readiness check IFC 4.3 BIM for submission
02
Programme design and feasibility

Villa, multifamily, mixed-use, hotel. We set the room mix, the unit count, and the cost structure before you commission drawings.

GFA and unit-mix optimisation Build-cost estimate by trade Rental yield and IRR projection Parking and infrastructure capacity check
03
Architecture — schematic to construction

Concept through construction documents. Validated building model for Amanah. All governed by the 12 operational principles of the 1/0 grammar.

Concept + schematic design Validated building model (IFC 4.3) Amanah permit package Construction documentation
04
AI-assisted brief intelligence

Our Builder tool collects your project brief, runs regulatory checks, produces a cost estimate, and prepares an AI-ready design brief — before the first meeting.

299 SAR — compliance check, 6 verdicts 499 SAR — profitability reality test Studio brief prepared automatically
Packages

Clear fees.
No surprises.

All fees in SAR. Site Reading converts to full service — the fee is deducted if you proceed within 30 days.

Entry point
Site Reading
SAR 15,000 - 25,000
Fixed fee by plot area
  • Regulatory envelope analysis
  • Massing feasibility + 3 renders
  • DASC ADG compliance check
  • Preliminary cost estimate
5-7 working days
Investment
Apartment Full Service
6-8% of construction cost
SAR 300,000-800,000 typical
  • Feasibility study + unit-mix optimisation
  • SD through CD + Amanah submission
  • Consultant coordination (struct + MEP)
  • IFC 4.3 buildingSMART validated
16-24 weeks
Villa Concept Package SAR 45,000 - 75,000
Apartment Feasibility Study SAR 35,000 - 60,000
BIM / IFC Compliance Audit SAR 8,000 - 15,000
DASC Compliance Review SAR 10,000 - 20,000
Construction Administration SAR 5,000 - 10,000 /month
Operational principles

The 12

Not aspirational. Each is testable at the drawing stage. If a design cannot pass all twelve, it is not a 10 project.

01 Mass first, void second Sculpted, not boxed. Every project deploys at least 3 of the 10 articulation moves. Plain cuboid is a hard fail. الكتلة أولاً، الفراغ ثانياً
02 1/0 grammar Straight is mass, curved is void. Every design element is one or the other, or a merge zone. Not symbolism — structural logic. قواعد 1/0
03 Regulation before aesthetic FAR, coverage, setbacks and parking are calculated before any form-making begins. Authority hierarchy: MOMAH → SBC → DASC ADG. اللوائح قبل الجماليات
04 Site reads first Every project begins with a mandatory site reading: DASC character zone, solar orientation, prevailing wind, acoustic load, visual corridors. قراءة الموقع أولاً
05 Regional skin, constant kernel The 1/0 kernel is fixed. Materials, palette, and articulation flex per DASC ADG zone. TRANSITIONAL register by default — contemporary, not pastiche. القشرة الإقليمية، النواة ثابتة
06 Mandatory curved void Every project must contain at least one curved void visible at building scale: bowed-lintel opening, circular oculus, oval window, curved cantilever. الفراغ المنحني إلزامي
07 IFC before permit All projects produce a validated building model (IFC 4.3) before permit submission. BIM execution plan drafted at Phase 0. Requirements confirmed with Amanah before design begins. IFC قبل الترخيص
08 Operations at 80% 80% of design effort is operational: programme, structure, climate, code compliance. 20% is iconographic: the one bronze screen, the one carved oculus. العمليات بنسبة 80٪
09 No borrowing No hexagonal mashrabiya, no Persian girih, no Mughal jali. 10 operates five brand-derived panels built only from kernel elements. بلا استعارة
10 One arch type Saudi-Najdi flat-shouldered segmental (R = W/6, spring line at 0.7× height). Roman semi-circular, pointed Persian, horseshoe — all forbidden. نوع قوس واحد
11 Viability before design CAPEX, OPEX, and ROI calculated before schematic design begins. If the numbers don't work at Phase 0, the project does not proceed to Phase 1. الجدوى قبل التصميم
12 Document everything Every phase transition is gated: views captured, analysis presented, client approved, git tagged. Nothing carries forward unresolved. توثيق كل شيء
How we work

Five phases.
Zero surprises.

01
Brief and Regulation

Run the Builder. We collect your brief, run the MOMAH and DASC compliance check, and confirm the plot can carry your programme.

Phase 0 · 1 week
02
Concept Design

Three massing options, each deploying the 1/0 grammar at site scale. Regulatory, financial, and brand compliance tested on all three.

Phase 1 · 2–3 weeks
03
Schematic Design

Floor plans, sections, elevations. DASC character detail applied. IFC LOD 200 produced. Structural and MEP consultants coordinated.

Phase 2 · 3–4 weeks
04
BIM and Permit

Full BIM authoring. IFC 4.3 export and validation. Amanah permit package prepared and submitted via Balady.

Phase 3 · 3–4 weeks
05
Construction Documents

Full CD set: architectural, structural, MEP. Final IFC delivered to client at handover.

Phase 4–5 · 4–6 weeks
Commission a project

Start with
your plot.

Tell us the site area, the typology, and the budget. We run the regulation and the feasibility before the first meeting. No drawings until the numbers work.

Practice
10 عشرة Architecture
Location
Jeddah, Saudi Arabia
Services
Residential · Mixed-use · Commercial
Standards authority
MOMAH · SBC · DASC ADG_06
BIM standard
IFC 4.3 · Amanah Jeddah compliant